GENERAL TECHNICAL SESSION I
Monday, September 20, 2010 - 8:15am -
11:30am
Salons G, H & I - Presiding: Jim Rozsits
|
|
| PCIC-2010-01 |
The Application of Switchgear in Unusual Environments |
| |
|
Jim Bowen
Michael Wactor
Matt Moore |
Dashiell
Powell
Powell |
|
| PCIC-2010-02 |
Management of Electrical Equipment Obsolescence at Oil and Gas Industrial Facilities –
Case Study |
| |
|
Ali Al-Qahtani
Lisardo Lourido M
Rami Dabbousi
Odah O Al-Shahrani |
Saudi Aramco
Saudi Aramco
Saudi Aramco
Saudi Aramco |
|
| PCIC-2010-03 |
Maintenance Strategies for a New Era in Electrical Safety |
| |
|
Lanny Floyd
David Staat
Paul Sullivan
Edward Thorton |
DuPont
DuPont
DuPont
DuPont |
| |
|
|
|
GENERAL TECHNICAL SESSION II
Monday, September 20, 2010 - 2:00pm - 5:00pm
Salon H - Presiding: John Nelson
|
|
| PCIC-2010-04 |
Applying High Resistance Neutral Grounding for Medium Voltage Systems |
| |
|
Larry Kingrey
Anthony Locker
Ralph Painter |
Worley Parsons
Littlefuse
Tampa Electric Company |
|
| PCIC-2010-05 |
A User's Guide to Selecting and Applying Medium Voltage Adjustable Speed Drives |
| |
|
J.J. Dai
Gary Donner
Bill Lockley
Jun Qiu
Farrokh Shokooh |
Operation Technology, Inc.
Operation Technology, Inc.
Lockley Engineering
Operation Technology, Inc.
Operation Technology, Inc. |
|
| PCIC-2010-06 |
MV System Design: A Paradigm Shift |
| |
|
Ray Catlett
Jerry Earl
Martin Koenig |
ABB
ABB
ABB |
|
|
|
|
|
|
ELECTROCHEMICAL TECHNICAL SESSION I
Monday, September 20, 2010 - 2:00 pm - 5:00
pm
Salon I - Presiding: Sheldon Kennedy
|
|
|
| PCIC-2010-07 |
Improving Electrical Safety in an Electrolytic Cell Line |
| |
|
Aaron Long
Brad Boyd
Reinaldo Machado
Jeff Phillips
Ed Kelly
Marcel Tremblay
Ed Cialkowski |
Air Products
Air Products
Air Products
Air Products
Air Products
Bender, Inc.
Air Products |
|
| PCIC-2010-08 |
When to Replace Aging Transformers |
| |
|
Fred Dixon
David Seward
James Hoffmeister |
Chevron Phillips
Alamo Transformer Supply Co.
Alamo Transformer Supply Co. |
|
| PCIC-2010-09 |
Methods for Arc-Flash Detection in Electrical Equipment |
| |
|
George Roscoe
Marcello Valdes
Ray Luna |
GE Industrial Solutions
GE Industrial Solutions
GE Digital Energy, Multilin |
|
|
|
INTERNATIONAL TECHNICAL SESSION I
Monday, September 20, 2010 - 2:00pm - 5:00pm
Salons K&L - Presiding: Estellito Rangel, Jr.
|
| |
| PCIC-2010-10 |
Balancing Flexible Rotors of Large Electrical Machines |
| |
|
Martin Regener
Lutz Huebner |
Siemens (Germany)
Siemens (Germany) |
|
| PCIC-2010-11 |
Motor Design Considerations for Medium Voltage Adjustable Speed Drives in Hazardous Areas |
| |
|
Sami Kanerva
Silvia Bono
Bernhard Oberbauer
Holger Persson
Gerald Scheuer |
ABB (Finland)
ABB (Italy)
Borealis Polyolefin (Austria)
ABB (Sweden)
ABB (Switzerland) |
|
| PCIC-2010-12 |
Harmonizing Ventilation Requirements for Indoor Lighter Than Air Hazardous Atmospheres |
| |
|
Troy Rains
Bipin Satavalekar |
Fornax Consulting
Worley Parsons Canada |
|
|
|
|
|
MARINE TECHNICAL SESSION I
Monday, September 20, 2010 - 2:00pm -
5:00pm
Salon G - Presiding: Donald A. Voltz
|
|
|
| PCIC-2010-13 |
Direct Current Circuit Breaker Primer |
| |
|
Heather Pugliese
Mike VonKannewurff |
GE Energy
GE Energy |
|
| PCIC-2010-14 |
Integrated Power System Design for Offshore Energy Vessels & Deep Water Drilling Rigs |
| |
|
Cameron Craig
Mohammed Islam |
ENSCO International, PLC
M&R Global |
|
| PCIC-2010-15 |
Design Considerations When Applying Various ASD Topologies to Meet Harmonic Compliance |
| |
|
Anthony H. Hoevenaars
Michael Fahrney
Michael James
Michael McGraw |
Mirus International, Inc.
Benshaw Advances Controls and Drives
EDG Consulting Engineers
NSOEM |
|
|
|
|
|
CHEMICAL TECHNICAL SESSION I
Tuesday, September 21, 2010 - 8:30am -
11:30am
Salon I - Presiding: Dennis Bogh
|
| |
| PCIC-2010-16 |
Induction vs. Synchronous Motors - Different Perspectives: End User/Motor Manufacturer |
| |
|
Paul Gaynor
Bob Krusemark
Daniel Frary |
ExxonMobil Research & Engineering
GE Energy - Motors
ExxonMobil Refining & Supply |
|
| PCIC-2010-17 |
Design of a Priority-Based Load Shed Scheme and Operation Tests |
| |
|
Mark Adamiak
Bernard Cable
Michael Schiefen
Gary Schauerman |
GE Digital Energy
GE Energy
BASF
BASF |
|
| PCIC-2010-18 |
Application and Advantages of PAM Multispeed Motors in Petroleum and Chemical Industries |
| |
|
Javier Portos
Dan Eaton
M.P. Reddy |
TECO-Westinghouse Motor Company
Marathon Petroleum Company
TECO-Westinghouse Motor Company. |
|
|
|
|
|
PRODUCTION TECHNICAL SESSION I
Tuesday, September 21, 2010 - 8:30am-11:30am
Salon G - Presiding: Larry Saunders
|
|
|
| PCIC-2010-19 |
Lightning Dangers on Corrugated Tubing Carrying Hydrocarbons |
| |
|
Robert A. Durham
Marcus O. Durham |
THEWAY Corp/U of Tulsa
THEWAY Corp/U of Tulsa |
|
| PCIC-2010-20 |
How Accurate are Your Arc-Flash Hazard Study Results |
| |
|
Pirooz Barkhordar, PE |
SKM System Analysis, Inc. |
|
| PCIC-2010-21 |
Applications of UL Type MC-HL Cable (Downstream and Upstream Oil & Gas Facilities) |
| |
|
E.J. (Bart) Bartolucci
Craig S. Schiro |
The Okonite Company
Marathon Oil Company |
|
|
|
|
|
REFINING TECHNICAL SESSION I
Tuesday, September 21, 2010 - 8:30am -
11:30am
Salon H - Presiding: Gabe D'Alleva
|
|
|
| PCIC-2010-22 |
What Do The API Motor/Generator Features Cost and What Do They Buy You? |
| |
|
Bill Lockley
Barry Wood |
Lockley Engineering
Chevron |
|
|
| PCIC-2010-23 |
Transients During Line-Side Starting of Squirrel Cage Induction Motors |
| |
|
Michael Melfi
Stephen Umans |
Baldor Electric
Consultant |
|
|
| PCIC-2010-24 |
A Motor Primer, Part 9 |
| |
|
Bryan Oakes
Wayne Paschall
Gary Donner
Gerard Ngo |
Baldor Electric
Baldor Electric
Operational Technology, Inc.
BP North America |
|
|
|
|
|
SAFETY TECHNICAL SESSION I
Tuesday, September 21, 2010 - 8:30am -
11:30am
Salon K - Presiding: Kevin Lippert
|
|
|
| PCIC-2010-25 |
Testing PPE for Arc Hazard Protection - IEC 61482-1 Test Rig Evaluation Including Proposed Changes |
| |
|
David Sweeting |
Sweeting Consulting |
|
|
| PCIC-2010-26 |
A Step Closer Towards Maintenance Free Gear |
| |
|
David Loucks |
Eaton Corporation |
|
|
| PCIC-2010-27 |
Focused Evolution of an Electrical Safety Culture |
| |
|
James Mitchem
Mark Cross
Daryld Ray Crow |
TIC Industrial
TIC Southeast
DRC Consulting Ltd. |
|
|
|
|
|
TRANSPORTATION TECHNICAL SESSION I
Tuesday, September 21, 2010 - 8:30am -
11:30am
Salon J - Presiding: Richard Paes
|
|
|
| PCIC-2010-28 |
Basic Sound Level Knowledge for Electric Motor Application |
| |
|
Joe Hillhouse |
Baldor Electric Company |
|
|
| PCIC-2010-29 |
An Induction Motor - Keep It Running |
| |
|
Rajendra V. Mistry
William Finley
Scott Kreitzer
Emam Hashish |
Siemens (USA)
Siemens (USA)
Siemens (USA)
Siemens (USA) |
|
|
| PCIC-2010-30 |
Failure Analysis of 7500HP Induction Motors Driving Reciprocating Compressor with Three Years Service |
| |
|
Robert Hanna
Dennis W. Schmitt |
RPM Engineering Ltd.
EnCana Oil & Gas |
|
|
|
|
|
INTERNATIONAL TECHNICAL SESSION II
Wednesday, September 22, 2010 - 8:30am -
11:30am
Salon G - Presiding: Horst Kuemmlee
|
|
|
| PCIC-2010-31 |
Active Magnetic Bearing Systems with Standard Drive Technology for Large Turbomachines |
| |
|
Hartmut Walter
Joachim Denk
Dietmar Stoiber |
Siemens (Germany)
Siemens (Germany)
Siemens (Germany) |
|
|
| PCIC-2010-32 |
IEC 61850 Capabilities Applied to Oil and Gas Industry |
| |
|
Mohammad Aurangzeb
Bruno Andre
Luc Hossenlopp |
Areva (USA)
Areva (France)
Areva (France) |
|
|
| PCIC-2010-33 |
International Installation Methods Based on NEC and IEC Standards |
| |
|
Gerhard Schwarz
Peter Thurnherr
Heribert Oberhem
Brian Keane |
Cooper Crouse-Hinds (Germany)
Thuba (Swiss)
Currenta (Germany)
Cooper Crouse-Hinds (Canada) |
|
|
|
|
|
MARINE TECHNICAL SESSION II
Wednesday, September 22, 2010 - 8:30am -
11:30am
Salon I - Presiding: Rudy Bright
|
|
|
| PCIC-2010-34 |
Transient Overvoltage Protection of Shore-to-Ship Power Supply System |
| |
|
Dev Paul
Vahik Haddadian |
AECOM
The Port of Los Angeles |
|
|
| PCIC-2010-35 |
Control/Protection Architecture for Power Electronics Converters |
| |
|
Narian Hingorani
Herbert Ginn III
Joseph Sullivan |
Consultant
Mississippi State University
NSWC Carderock Division |
|
|
| PCIC-2010-36 |
Industrial Fieldbus Technology and Fieldbus Cable Overview - Cable Standards and Electrical Qualifications |
| |
|
Gil Shoshani
Stan Stephen
Stephen Mitschke |
RSCC
Dekoron Wire and Cable
Field Bus Foundation |
|
|
|
|
|
REFINING TECHNICAL SESSION II
Wednesday, September 22, 2010 -
8:30am-11:30am
Salon J - Presiding: Kirti Shah
|
|
|
| PCIC-2010-37 |
Implementing an Electrical Network Monitoring & Control System on a Grass Roots Refinery Project - Part 1 |
| |
|
Ashish Deshmukh
Donald Dunn
Kenneth McAlister
Keith McCarthy |
KBR
Aramco Services Company
Aramco Services Company
KBR |
|
|
| PCIC-2010-38 |
Improvements in Protection and Commissioning of Digital Transformer Relays at Medium Voltage Industrial Facilities |
| |
|
Charles Mozina |
Beckwith Electric |
|
| PCIC-2010-39 |
Replacement of the Main 115kV/13.8kV Substations at a Large Refinery - Justification, Design and Implementation |
| |
| |
Troy Parvino
Barry Wood
Jacob Ansley |
Chevron
Chevron
Chevron |
|
|
|
|
|
SAFETY TECHNICAL SESSION II
Wednesday, September 22, 2010 - 8:30am -
11:30am
Salon M - Presiding: Paul Sullivan
|
|
|
| PCIC-2010-40 |
Arc Flash Hazards with Electric Fire Pump Installations |
| |
|
Richard Holub
Dan Doan
Robert Anderson |
DuPont Engineering
DuPont Enginering
DuPont Engineering |
|
|
| PCIC-2010-41 |
Mitigating Electrical Shock and Arc Flash Energy - A Total System Approach for Personnel and Equipment Protection |
| |
|
Daleep Mohla
Tim Driscoll
Paul Hamer
Sergio Panetta |
DCM Electrical Consulting Services, Inc.
OBIEC Consulting Ltd.
Chevron Energy Technology Co.
I-Gard Corp. |
|
|
| PCIC-2010-42 |
Measuring Performance of Your Electrical Safety Program by Audit |
| |
|
Terry Becker
Robert Neish |
ESPS Electrical Safety Program Solutions
Shell Canada Energy |
|
|
|
|
|
CHEMICAL TECHNICAL SESSION II
Wednesday, September 22, 2010 - 2:00pm -
5:00pm
Salon I - Presiding: John Malinowski
|
|
|
| PCIC-2010-43 |
Root Cause Failure Analysis of AC Induction Motors Used in Petroleum and Chemical Industry |
| |
|
Austin Bonnet |
Emerson Electric (Retired) |
|
|
| PCIC-2010-44 |
A Comparative Study Between Copper and Aluminum Induction Squirrel Cage Constructions |
| |
|
Renato Yabiku
Rafael Fialho
Luis Teran
Alexandre Santos
Estellito Rangel
Diogenes Dutra |
GEVISA GE Motors
GEVISA GE Motors
GEVISA GE Motors
GEVISA GE Motors
Petrobras
Petrobras |
|
|
| PCIC-2010-45 |
Motor Efficiency, Efficiency Tolerances and the Factors that Influence Them |
| |
|
Harry Li
Radu Curiac |
Siemens Industry
Siemens Industry |
|
|
| |
|
ELECTROCHEMICAL TECHNICAL SESSION II
Wednesday, September 22, 2010 - 2:00pm -
5:00pm
Salon H - Presiding: Dennis Cochran
|
| |
| PCIC-2010-46 |
Protection of Large Power Conversion Equipment |
| |
|
James H. Galloway
Paul Buddingh |
J.H. Galloway & Associates
Andritz Automation, Ltd. |
|
|
| PCIC-2010-47 |
Harmonic Analysis and Multi-Stage Filter Design for a Large Bleach Production Facility |
| |
|
Ritchie Pragale
Thomas J. Dionise
David D. Shipp |
Eaton Corporation
Eaton Corporation
Eaton Corporation |
|
|
| PCIC-2010-48 |
Direct to Bleach - Electrical Issues for a New Trend in Electrochemical Plants |
| |
|
Paul Buddingh
Jim Sims |
Andritz Automation, Ltd.
Ineous Technologies, Inc. |
|
|
| |
|
PRODUCTION TECHNICAL SESSION II
Wednesday, September 22, 2010 - 2:00pm -
5:00pm
Salon J - Presiding: Robert Durham
|
|
|
| PCIC-2010-49 |
Power Systems Communications and Modularity |
| |
|
Cyril (Cy) Benisch
Arthur T. Davies II
Timothy Large
Rod McRae |
Cooper Power Systems
The Gund Company, Inc.
Anadarko Petroleum
HD Supply |
|
|
| PCIC-2010-50 |
Installation, Operation and Maintenance Considerations for Electrical Equipment in Hazardous Locations |
| |
|
Marty Cole
Tim Driscoll
Ken Martin
Rick Paes |
Hubbell Canada - Killark
OBIEC Consulting, Ltd.
Brodwell Industrial Sales, Ltd.
Rockwell Automation |
|
| PCIC-2010-51 |
Integrating Electric Heat Tracing Controls in Industrial Facilities |
| |
|
Larry Stehling
Joe Alanis |
Emerson Industrial Automation
Bechtel Corporation |
|
|
|
|
|
TRANSPORTATION TECHNICAL SESSION II
Wednesday, September 22, 2010 - 2:00pm -
5:00pm
Salon M - Presiding: John Rama
|
| |
| PCIC-2010-52 |
Integrated SCADA-Based Approach for Pipeline Security and Operation |
| |
|
Terence Hazel
Daniel Vogt
Gerhard Geiger |
Schneider Electric
Krohne
University of Gelsenkirchen |
|
|
| PCIC-2010-53 |
Electrical Rotating Machinery Standards, The Past, Present and Future of Motor & Generator Deisgn |
| |
|
Stephen Cary
Mario Lanaro
Juan Sanchez
Erik Daron |
Toshiba International Corporation
Florida Power & Welding
Colonial Pipelines
Sulzer Pumps |
|
|
| PCIC-2010-54 |
Magnetic Bearings - A Review of the Economics & Operational Experience |
| |
|
John Rama
Dan Eaton
Sumit Singhal |
Synchrony, Inc.
Marathon Petroleum Company
Siemens Industry, Inc. |
|
|
|
|