2009 PCIC CONFERENCE TECHNICAL PROGRAM – PRELIMINARY
This list of technical papers will be presented at the 2009 IEEE-PCIC Conference. Any last minute changes to the final program can be found on the PCIC 2009 Anaheim Conference website.
GENERAL TECHNICAL SESSION
Monday September 14, 2009 – 8:30 a.m. – 11:30 a.m Hilton – California C/D Presiding – Jim Rozsits
PCIC-2009-01
Energy Transfers within Arcing Faults in Electrical Equipment
Dr. David Sweeting
Sweeting Consulting
PCIC-2009-02
Arc Flash Energy Mitigation by Fast Energy Capture
George Roscoe
Tom Papallo
Marcelo Valdes, PE
GE Consumer and Industrial
GE Consumer and Industrial
GE Consumer and Industrial
PCIC-2009-03
Consideration For Generation in an Islanded Operation
E. Roy Hamilton
John Undrill
Paul S. Hamer
Scott Manson
Chevron ETC John Undrill LLC
Chevron Energy Technology Company
Schweitzer Engineering Laboratories, Inc
GENERAL TECHNICAL SESSION II
Monday September 14, 2009 – 2:00 p.m. – 5:00 p.m. Hilton – California C/D Presiding – John Nelson
PCIC-2009-04
Revisions to IEEE 1068: Standard for the Repair of AC Electric Motors in Process Industries
Travis Griffith
Austin Bonnett
Bill Lockley
Chuck Yung
GE Oil & Gas
Emerson Electric (Retired)
Lockley Engineering
EASA
PCIC-2009-05
A User’s Guide to Factory Testing of Large Motors: What Should Your Witness Expect?
Dennis L. Bogh Donald G. Dunn Meredith K.W. Stranges Nick Stranges
GE Energy Aramco Services Company GE Energy GE Energy
PCIC-2009-06
Recent Problems Experienced with Motor and Generator Windings
G.C. Stone
M. Sasic
D. Dunn I. Culbert
Iris Power LP Iris Power LP Aramco Services Company Iris Power LP
ELECTROCHEMICAL TECHNICAL SESSION
Monday September 14, 2009 – 2:00 p.m. – 5:00 p.m.
Hilton – California A Presiding – Sheldon Kennedy
PCIC-2009-07
DC Arc Models and Incident Energy Calculations
Ravel F. Ammerman, PhD Tammy Gammon, PhD, PE P.K. Sen, PhD, PE John P. Nelson, PE
Colorado School of Mines John Matthews & Associates Colorado School of Mines NEI Electric Power Eng.
PCIC-2009-08
Reducing Arc Flash Risk with the Application of Protective Relays
Ray Luna Brian Cassidy, P.E. Jesus Franco
GE Multilin Bayer Material Science Bayer Material Science
PCIC-2009-09
Quantifying the Energy Efficiency of Motors Fed By Adjustable Frequency Inverters
Michael J. Melfi
Baldor Electric
MARINE TECHNICAL SESSION I
Monday September 14, 2009 – 2:00 p.m. – 5:00 p.m.
Hilton – California B Presiding – Don Voltz
PCIC-2009-10
IEEE Electric Ship Technologies Initiative
Yuri Khersonsky Narain Hingorani Kevin L. Peterson, P.E.
Consultants Consultants P2S Engineering, Inc
PCIC-2009-11
The Effects of System Voltage on Electric Machine Design
Chris Heron Daniel Saban, P.E.
TECO-Westinghouse Motor Co. Direct Drive Systems
PCIC-2009-12
Preventing AC Drive Failures Due to Commutation Notches on a Drilling Rig
A.H. Hoevenaars, P.Eng. I. C. Evans B. Desai
Mirus International Inc. Harmonic Solutions Co. UK National Oilwell Varco
CHEMICAL TECHNICAL SESSION I
Tuesday September 15, 2009 – 8:30 a.m. – 11:30 a.m
Hilton – Pacific B Presiding – Roger Lawrence
PCIC-2009-13
A New More Reliable Solution for Cooling Tower Fan Drives
Robbie McElveen Keith Lyles Bill Martin Wayne Wasserman
Baldor Electric Company BP Products North America Inc Baldor Electric Company Baldor Electric Company
PCIC-2009-14
Use of Thermal Network on Determining the Temperature Distribution Inside Electric Motors in Steady State and Dynamic Conditions
Renato Yabiku, P.E.
Rafael Fialho, P.E.
Luis Teran, P.E.
Marcilio Ramos, P.E.
Nelson Kawasaki, P.E.
GEVISA GE Motors
GEVISA GE Motors
GEVISA GE Motors
GEVISA GE Motors
GEVISA GE Motors
PCIC-2009-15
Ensuring Availability of a Large Adjustable Speed Drive for Process Gas Compressor Application Rated 11 kV, 15.5 MW (20778hp)
Frieder Endrejat
Dr. Robert Hanna, Ph. D
John Shultz
Sasol Technology (Pty) Ltd
RPM Engineering Ltd
Siemens Energy & Automation, Inc
PRODUCTION TECHNICAL SESSION I
Tuesday September 15, 2009 – 8:30 a.m. – 11:30 a.m.
Hilton – California D Presiding – Larry Saunders
PCIC-2009-16
Impact of Utility Available Fault Current on Arc Flash Calculations
Ilanchezhian Balasubramanian, P.E. Aidan M. Graham, P.E.
Eaton Electrical
Eaton Electrical
PCIC-2009-17
Power Transmission to Distant Offshore Facilities
Zaki Al-Haiki Ahmed Shaikh-Nasse
Saudi Arabian Oil Company Saudi Arabian Oil Company
PCIC-2009-18
Developing & Installing Substations for Oil & Gas Facilities in Very Cold and Remote Locations
Ulf Andersson, PE Duane C. Jubert, PE Tracey Evers, MSEE
ABB Inc. Shell Exploration & Production Co. ABB Inc.
REFINING TECHNICAL SESSION I
Tuesday September 15, 2009 – 8:30 a.m. – 11:30 a.m.
Hilton – California C Presiding – Gabe D'Alleva/Kirti Shah
PCIC-2009-19
Introduction to IEEE 841-2009 for Severe Duty TEFC Squirrel Cage Induction Motors- up to 370 kW (500 HP)
David C. Rains Daleep C. Mohla Gabe F. D’Alleva John Malinowski
AREVA T&D DCM Consulting ExxonMobil Corporation Baldor Electric Company
PCIC-2009-20
Why Wait? System-Wide Benefits from Custom Overcurrent Relay Characteristics
Dennis J. Hill, P.E. Larry W. Bruehler, P.E. Christopher J. Bohrer, P.E.
URS - Washington Division URS - Washington Division URS - Washington Division
PCIC-2009-21
A Motor Primer – Part 8
Timothy Wayne Paschall Gary Donner, P.E. Jim Kelley Royce M. King
Baldor Electric O.T.I. Baldor Electric ConocoPhillips
TRANSPORTATION TECHNICAL SESSION I
Tuesday September 15, 2009 – 8:30 a.m. – 11:30 a.m.
Hilton – California A Presiding – Richard Paes
PCIC-2009-22
Key Elements to Consider when Developing Electrical Equipment Isolation and Switching Procedures
Shahid Jamil, M.Sc; P.Eng. John D. Aeiker, PE, CSP
Imperial Oil Limited E.I. DuPont de Nemours, Inc.
PCIC-2009-23
Beyond IEEE Std 115 & API 546: Test Procedures For High-Speed, Multi-Megawatt Permanent-Magnet
Synchronous Machines
Daniel M. Saban, PE PhD Cassandra Bailey Klaus Brun, PhD Delvis Gonzalez-Lopez, PhD
Direct Drive Systems Direct Drive Systems Southwest Research Institute Direct Drive Systems
PCIC-2009-24
Designing More Efficient Large Industrial Induction Motors by Utilizing the Advantages of Adjustable Speed
Drives
Harry Li Radu Curiac
Siemens Energy & Automation Siemens Energy & Automation
CHEMICAL TECHNICAL SESSION II
Wednesday September 16, 2009 – 8:30 a.m. – 11:30 a.m
Hilton – California C Presiding – Dennis Bogh
PCIC-2009-25
Core Loss Testing: A Good Procedure Gone Astray?
Chuck Yung
Travis Griffith
EASA GE Oil & Gas
PCIC-2009-26
Camera Systems in Hazardous (Classified) Locations to Monitor and Control the Separation of Liquid Waste Products in Chemical Plants
Ingo Emde
Wolfgang Berner
Klaus Mertens
R. STAHL HMI Systems GmbH
R. STAHL Inc.
Bayer MaterialScience AG
PCIC-2009-27
Solid State Lighting for Industrial Locations
Michael Neary
Michael Quijano
Cooper Crouse-Hinds
Future Lighting Solutions
INTERNATIONAL TECHNICAL SESSION
Wednesday September 16, 2009 – 8:30 a.m. – 11:30 a.m
Hilton – Pacific B Presiding – Estellito Rangel Junior
PCIC-2009-28
Low-Voltage Circuit Protection in Hazardous Locations - A Comparison of Codes and Standards within IEC, CEC and NEC
Wolfgang Berner Scott Basinger, P.Eng. Tim Driscoll, P.Eng. Ken Martin, C.E.T. Juergen Poidl Mark Throckmorton, P.Eng.
R. STAHL Inc (USA) Eaton Corporation (Canada) Shell Global Solutions (Canada) Brodwell Industrial Sales Ltd. (Canada) R. STAHL Schaltgeraete GmbH (Germany) Shell Global Solutions (Canada)
PCIC-2009-29
A Multifunction Energy Saving Device With a Novel Poweroff Control Strategy for Beam Pumping Motors
Luo Yingli Cui Xueshen Zhao Haisen Zhang Deqin Luo Yu Wang Yilong
North China Electric Power University (China) North China Electric Power University (China) North China Electric Power University (China) North China Electric Power University (China) North China Electric Power University (China) Huadianzhixing Technology Development Corp. Ltd. (China)
PCIC-2009-30
CT Saturation Calculations - Are They Applicable in the Modern World? - Part IV: CT Sizing as per IEC Standards and the Benefits of Non Conventional Instrument Transformers
Pierre Bertrand Dr. Michael Mendik Terence Hazel Pascal Tantin
Schneider Electric (France) ABB Inc. (USA) Schneider Electric (France) EDF R&D (France)
PRODUCTION TECHNICAL SESSION II
Wednesday September 16, 2009 – 8:30 a.m. – 11:30 a.m.
Hilton – California B Presiding – Larry Saunders
PCIC-2009-31
Directives for Offshore Service Containers
Estellito Rangel Jr. Lino A. de André
Petrobras DeAndré Engenharia
PCIC-2009-32
Benchmarking Electric Motors Before They Fail
Austin Bonnett Chuck Yung
Emerson Electric (Retired) EASA
PCIC-2009-33
Enhanced Oil Recovery of Shallow Wells with Heavy Oil: A Case Study in Electro Thermal Heating of California Oil Wells
Greg McQueen, PE, PMP David Parman, P. Eng. Heath Williams
Tyco Thermal Controls Tyco Thermal Controls E & B Natural Resources
TRANSPORTATION TECHNICAL SESSION II
Wednesday September 16, 2009 – 8:30 a.m. – 11:30 a.m.
Hilton – California A Presiding – Richard Paes
PCIC-2009-34
Ground Fault Protection for MV Bus Connected Generators
Dale Finney Hyder DoCarmo Roy E. Cossé, Jr. Masoud Hajiaghajani
GE Multilin OMICRON electronics Chevron Chevron
PCIC-2009-35
Oil Whirl Rotordynamic Instability Phenomenon – Diagnosis and Cure in Large Induction Motors
Sumit Singhal Rajendra Mistry, P.E.
Siemens Energy & Automation Siemens Energy & Automation
PCIC-2009-36
Comparative Analyses of Standards Temperature Rise Test Methods for Induction Machines
Glauco Cisz, MS Fredemar Rüncos, Dr. Eng. Stephen Waite, BS
WEG WEG WEG Electric
MARINE TECHNICAL SESSION II
Wednesday September 16, 2009 – 2:00 p.m. – 5:00 p.m.
Hilton – California B Presiding – Rudy Bright
PCIC-2009-37
“The Second Electronic Revolution” (It's All About Control)
Terry Ericsen
Office of Naval Research
PCIC-2009-38
Fire Rated Cable Technology Testing Methods and Installation Practices
Robert Konnik Mark Throckmorton, P.Eng. Gilad Shoshani
RSCC Group Shell Canada RSCC Group
PCIC-2009-39
The Benefits of Polymeric Armored Cables
Carroll Lindler Paul Cinquemani Chris Averill
Prysmian Power Cables & Systems Prysmian Power Cables & Systems Prysmian Power Cables & Systems
REFINING TECHNICAL SESSION II
Wednesday September 16, 2009 – 2:00 p.m. – 5:00 p.m.
Hilton – California A Presiding – Kirti Shah
PCIC-2009-40
Improving Substation Reliability and Availability
Robert M. Spiewak, P.E. Dominik Pieniazek, P.E. Jerry Pittman, P.E. Floyd Weisse, P.E. Daniel Wilson
Dashiell, LLC Dashiell, LLC Valero Energy Corp. Dashiell, LLC Valero Port Arthur Refinery
PCIC-2009-41
Protection at the Speed of Light: Arc-Flash Protection Combining Arc Flash Sensing and Arc-Resistant Technologies
John A. Kay, CET Juha Arvola Lauri Kumpulainen
Rockwell Automation Canada VAMP VAMP
PCIC-2009-42
Protecting Essential Refining Operations Using Blast-Resistant Electrical Equipment Shelters
David Cole Raymond H. Bennett, P.E., PhD Deron Austin Matthew T. Edel, P.E.
Lectrus Corporation Baker Engineering & Risk Inc. Lectrus Corporation Baker Engineering & Risk Inc.
SAFETY TECHNICAL SESSION
Wednesday September 16, 2009 – 2:00 p.m. – 5:00 p.m.
Hilton – California C Presiding – Kevin Lippert
PCIC-2009-43
Predicting Let-Through Arc-Flash Energy for Current-Limiting Circuit Breakers
Tom Papallo Marcelo Valdes, PE George Roscoe
GE Consumer & Industrial GE Consumer & Industrial GE Consumer & Industrial
PCIC-2009-44
Higher Withstand MCC for Better Selective Coordination
Rajiv Kumar, P.E. Douglas Reed, P.E. Robert Morris Samuel Terry, P.E.
Eaton Corporation MWH Americas Eaton Corporation Eaton Corporation
PCIC-2009-45
Potential Impact of ANSI Z10 and CSA Z1000 on Reducing Electric Shock and Arc Flash Injuries
H. Landis Floyd, II, PE, CSP, CMRP
DuPont
|